Ushering the automobile industry into a cleaner, more efficient future
Set on ushering the automobile industry into a cleaner, more efficient future, our client sought to build a $1B USD chip manufacturing plant from the ground up and Systecon has been selected to provide a Turnkey Modular Utility Solution.
This custom designed, factory assembled, performance tested and delivered to this new site is cost efficient and saves valuable time, playing a vital role in this large-scale industrial client’s plans of production of semiconductor.
Key figures
Key figures
Problematisation and customer issues
Producing a Small Product for a Large Global Impact
Building a chip manufacturing plant valued at $1B USD from scratch is no simple feat, even for a large-scale industry leader in semiconductor innovation. When the client developed plans for a fabrication facility in Marcy, NY set to produce a new form of silicone carbide semiconductors for electric automobiles, they required a partner with the capabilities to deliver contemporary cooling technology in time for a targeted 2022 opening, all while remaining in budget.
Our response
Pre-fabrication for an Efficient Process
Our modular method to factory construction relies on the pre-fabrication of key apparatuses. The modular solution approach allows for in-house time-saving prep work that results in the delivery of pre-constructed plant components designed in line with the customers unique project requirements. On this project, we are set to produce and transfer a system for chilled water pumping via a stainless-steel pump and a heat exchanger loop.
Silicon carbide semiconductors will facilitate more efficient power technology in automobiles, allowing for 6-10% less battery usage when compared to predecessor silicon chips; however, these advancements in vehicle energy efficiency would not be possible without the successful delivery of cooling plant technology that is within budget and on time.
Results
Systecon has completed their portion of work on this project in line with the client’s 2022 production start deadline and follows approximately $12M USD in work from sister company H.T. Lyons.